Newmont also has a promising pipeline of
new projects in development. At year-end 2004, development
of the underground Leeville and open pit Phoenix projects
in Nevada was on schedule. Gold sales from Leeville, the Company’s
first shaft underground gold mine in Nevada, and Phoenix,
Nevada’s largest reserve growth area in 2004, are estimated
at approximately 900,000 ounces annually during steady state
production.
Near Yanacocha, the completion of a feasibility
study for the Minas Conga gold-copper project resulted in
declaration of gold reserves of 8.7 million ounces (4.5 million
equity ounces). At Yanacocha, a feasibility study for an oxide
mill is being optimized with the objective of increasing economic
returns from the known mineralized material base.
With ongoing exploration and optimization
studies at Ahafo and Akyem, these projects should continue
to grow and offer significant economic upside. In Australia,
the Boddington joint venture is continuing work on an updated
feasibility study for a possible development decision in 2005.
 |
| The twin head frames for the ventilation and production
shafts at Leeville, Nevada’s next mine, stand ready
for production in late 2005. |
|